Operating Company
Gerdau
Materials Mined
Iron
Assessment Status
Surveillance Assessment In Process
Audit Information
Initial Audit: Details
Assessment scope
The scope included the extraction of iron in open pit mines, primary treatment facilities (UTM I and II), decommissioned Alemães tailings dam, waste and dry tailings storage facilities PDE Vigia Unificada and PDR Vigia, decommissioned waste dump PDE Bocaina, stormwater management infrastructure, co-product storage areas, fuel storage and fueling system, potable water treatment plant, wastewater treatment plants, security guard house, warehouses, changing rooms, dining room, administrative office building, health clinic, maintenance facilities, operations building, restaurant and laboratory.
Not included in scope: the Soledade reservoir and associated infrastructure and electrical substation, and the planned UTM II expansion, including the proposed pipeline from UTM II to the Gerdau Açominas’ steel plant in Ouro Branco.
The audit firm determined that the following chapters of the IRMA Standard were not relevant to this audit:
- Chapter 2.2—Free, Prior and Informed Consent
- Chapter 2.4—Resettlement
- Chapter 3.6—Artisanal and Small-Scale Mining
- Chapter 4.7—Cyanide Management
- Chapter 4.8—Mercury Management
Audit firm
Stakeholder input
To provide input or participate in audits please contact:
SCS Global Services
2000 Powell St. #600
Emeryville, California, USA 94608
feedback@scsglobalservices.com
Audit-related feedback
- To file a complaint about the audit results (e.g., achievement level, scores, content of audit reports) contact SCS Global Services at complaints@scsglobalservices.com
- To file a complaint about auditors or Certification Bodies (e.g., performance, competencies, potential conflicts of interest, etc.): file a complaint with IRMA.
Initial Audit: Timeline
| Completion Date | Status | Audit phase |
|---|---|---|
| Self-Assessment | ||
| 2023-06-28 | Third-Party Audit Announced | |
| 2023-08-01 | Third-Party Audit: Stage One (Desk Audit) | |
| 2023-09-05 | Third-Party Audit: Stage Two (On-Site Audit) | |
| 2023-11-08 | Draft Audit Report | |
| 2024-01-12 | Mine Site and IRMA Review Draft Audit Report | |
| 2024-11-13 | Updated Draft Audit Report | |
| Mine Site and IRMA Review Updated Draft Audit Report | ||
| 2025-03-20 | Audit Report Released |
Legend:
- Complete
- Started
- Has not started
Read a comprehensive description of the audit process and what each step entails.
Surveillance Audit: Details
Assessment scope
The surveillance audit will verify that the site operations continue to align with the performance previously recognized in the initial audit report. The audit team will verify that the mine’s systems and controls are still in place and are functioning effectively, that no major changes have occurred that negatively affect the mine’s performance, and that the site is progressing on its corrective action plan. The audit will also include confidential interviews with workers and engagement with community stakeholders. Following the completion of the surveillance audit, a report will be published on this page.
Audit firm
Stakeholder input
To provide input or participate in audits contact:
SCS Global Services
2000 Powell St. #600 Emeryville, California, USA 94608
feedback@scsglobalservices.com
Audit-related feedback
- To file a complaint about the audit results (e.g., achievement level, scores, content of audit reports) contact SCS Global Services at complaints@scsglobalservices.com
- To file a complaint about auditors or Certification Bodies (e.g., performance, competencies, potential conflicts of interest, etc.): file a complaint with IRMA.
Surveillance Audit: Timeline
| Completion Date | Status | Audit phase |
|---|---|---|
| 2026-08-20 | Announcement | |
| Desktop review | ||
| Stakeholder engagement plan | ||
| Onsite audit | ||
| Report | ||
| Public release |