Parent Company
MIND ID (PT Mineral Industri Indonesia) and Vale Canada Limited (VCL)
Operating Company
Vale (PT Vale Indonesia Tbk.)
Materials Mined
Nickel
Audit Information
Initial Audit: Details
Assessment scope
PT Vale’s Sorowako nickel mining operations are permitted through 2045. Mining began on site in 1968 and has been under current ownership since 2007. The multi-mine operation employs approximately 3,000 people and covers approximately 20 square km (the larger concession covers 700 sq km).
Facilities within the scope of the assessment include: open-pit(s), crusher(s), grinder(s) hydro power dam(s), smelter(s), scrap recycler(s), mine waste disposal, other waste management, maintenance and mechanics, laboratories, truck/rail loading, water treatment, and worker housing. Potentially affected communities include Towuti Village, Nuha Village, Wasuponda, and Malili.
Of the 26 chapters in the IRMA Standard for Responsible Mining, the operator suggests Chapters 2.2 Free, Prior and Informed Consent, 3.6 Artisanal and Small-Scale Mining, 4.7 Cyanide Management, and 4.8 Mercury Management do not apply. The verification body ERM CVS will evaluate these suggestions.
Audit firm
ERM CVS
To provide input or participate in audits, contact:
ERM Certification and Verification Services Limited
Exchequer Court, 33 St Mary Axe, London, EC3A 8AA
Amanda Russell, Email: post@ermcvs.com
Audit-related feedback
- To file a complaint about the audit results (e.g., achievement level, scores, content of audit reports) contact ERM-CVS at post@ermcvs.com
- To file a complaint about auditors or Certification Bodies (e.g., performance, competencies, potential conflicts of interest, etc.): file a complaint with IRMA.
Initial Audit: Timeline
| Completion Date | Status | Audit phase |
|---|---|---|
| 2024-12-03 | Self-Assessment | |
| 2024-12-17 | Third-Party Audit Announced | |
| 2024-12-24 | Third-Party Audit: Stage One (Desk Audit) | |
| 2026-02-16 | Third-Party Audit: Stage Two (On-Site Audit) | |
| Draft Audit Report | ||
| Mine Site and IRMA Review Draft Audit Report | ||
| Optional Corrective Action Period | ||
| Updated Draft Audit Report | ||
| Mine Site and IRMA Review Updated Draft Audit Report | ||
| Audit Report Released |
- Complete
- Started
- Has not started