Sibanye-Stillwater
Materials MinedPostponed
Details
The Sibanye-Stillwater US PGM complex includes the Stillwater and East Boulder underground mines. Stillwater started operations in 1986, East Boulder in 2001. Facilities co-located or on-site at the complex include crusher, grinder, mineral processing, tailings storage and dam, waste rock disposal, utility and transportation corridors and onsite power generation. Of the 26 chapters in the IRMA Standard for Responsible Mining, the operator suggests Chapters 2.4 Resettlement, 3.6 Artisanal and Small-Scale Mining, 4.7 Cyanide Management, and 4.8 Mercury Management do not apply. The independent audit firm will verify.
ERM CVS
To provide input or participate in audits, contact:
ERM Certification and Verification Services Limited
Exchequer Court, 33 St Mary Axe, London, EC3A 8AA
Amanda Russell, Email: post@ermcvs.com
- To file a complaint about the audit results (e.g., achievement level, scores, content of audit reports) contact ERM-CVS at post@ermcvs.com
- To file a complaint about auditors or Certification Bodies (e.g., performance, competencies, potential conflicts of interest, etc.): file a complaint with IRMA.
Timeline
| Completion Date | Status | Audit phase |
|---|---|---|
| Self-Assessment | ||
| 2023-11-21 | Third-Party Audit Announced | |
| 2023-11-21 | Third-Party Audit: Stage One (Desk Audit) | |
| Third-Party Audit: Stage Two (On-Site Audit) | ||
| Draft Audit Report | ||
| 2025-10-21 | Postponement | |
| Mine Site and IRMA Review Draft Audit Report | ||
| Optional Corrective Action Period | ||
| Updated Draft Audit Report | ||
| Mine Site and IRMA Review Updated Draft Audit Report | ||
| Audit Report Released |
- Complete
- Started
- Has not started